Superbilgi

Edition November 2026

Living Room Makeover: Caulking and Spackling Guide

Living Room Makeover: Caulking and Spackling Guide

I’m still working on the living room board and batten project and getting closer every day. I don’t want to spoil the full reveal yet, but I wanted to share the progress and what I tackled today so you can see how the space is shaping up.

The vertical boards are up on all the walls now—finally! I still need to install the top ledge around the room: that involves purchasing the trim, priming, painting, and attaching it. That last step shouldn’t take too long, but it’s the finishing touch that will make the room feel complete.

There are about five smaller boards left near the kitchen bar area that still need to be primed, painted, cut, and secured. My priority has been the living room so we can move furniture back into place and stop living with everything in the center of the room. I’m so ready for the day when the sofas can go back where they belong.

Today my two best helpers were my caulk and spackle. They made a huge difference in smoothing seams and covering nail holes so the walls read as a unified design.

I spent the day caulking and spackling every seam and joint. It’s tedious work, but it’s where the transformation really happens. Proper caulking fills gaps between the boards and the wall, and spackling smooths over nail holes and imperfections so the paint reads continuously across the surface. After this step, the board and batten looks much more intentional and polished.

A small hiccup: I must have irritated a sensitive spot on my finger while wiping caulk off the rough MDF edges—so my fingertip is sore. That aside, seeing the before-and-after made the effort worth it. Once the caulk has been applied and sanded, the assembly looks like a finished product rather than a construction project.

You might notice the pink spots in the photo on the right—that’s the spackling I used. This particular spackling goes on pink and dries white, which is a handy indicator for when it’s dry and ready to be sanded and painted. That visual cue makes the finishing work faster and more reliable because you don’t have to guess whether the compound has cured.

The next steps are sanding the spackled areas smooth, applying a primer coat where needed, and then painting the boards and ledge. After painting, I’ll attach the top trim and touch up any remaining gaps with caulk. Once all of that is complete, the living room will finally be ready for hanging art and styling with accessories.

I’m excited to get to the gallery wall and decorative details because that’s when the room will really feel lived-in and personal. For now, I’m savoring the steady progress and the visual payoff from properly finishing the trim work.

Thanks for following along—I hope you have a relaxing weekend and feel inspired to tackle a small home project of your own.

More Living Room Makeover Posts:

  1. Part 1: Paint
  2. Part 2: More Paint
  3. Part 3: You’re here!
  4. Part 4: Blue Accessories
  5. Part 5: Gallery Wall
  6. Part 6: Super Easy Throw Pillows
  7. Part 7: Final Reveal