I can’t believe we’re already past the halfway point of the year—and halfway through our first year in this house. At the start of the year I decided to step back from seasonal decorating and small crafts and instead focus on making this place feel like our home: a space that reflects who we are and what we love.
For the first time I set just three quarterly home goals, each focused on one room, and planned to revisit them each quarter to stay on track. It’s been working: the living room is complete, and both the office and the girls’ bedroom are nearly finished. A few final touches and those rooms will be done, and I’ll move on to the next space.
If you want to see the full journey, you can check my goals from January and April and the original “Our New Home” post for how the house looked when we moved in. Stay tuned at the end to see which room I’ll tackle next.
This post contains affiliate links for your convenience. See my full disclosure policy.
How I Did on My January–June Goals
Leftover Home Goals for 2020 (January–March)
1. Light Fixtures
- Hallway stairwell light: Completed. I installed the new wall sconces and gathered several options for anyone else looking for similar lighting.
- Entry light: Replaced recently—this project is finished and the new lantern in the foyer transformed the space.
- Overhead light in the office: We’ll likely add this when a contractor is here for larger work (such as the master bathroom gut job), so it’s deferred until an electrician is scheduled, likely in 2021.
2. The Office
- Blinds for the French doors: Ordered—bamboo blinds were back-ordered but are expected to arrive soon. Once they’re in, the office will feel much more finished.
Overall I’m pleased—most items were completed or are nearly done. Breaking goals into smaller quarterly lists has kept me focused and productive compared with past years when goals were easy to forget.
Home Goals for 2020 (April–June)
1. Girls’ Bedroom & Bathroom Makeover

Click/Tap the images below to shop the girls’ bedroom and bathroom:
- Painted the bedroom walls (Pink Ground by Farrow & Ball) — completed.
- Bathroom: instead of painting Shoji White, I chose wallpaper for a more dramatic, tailored look — completed.
- Accent wall or stencil: Instead of a bedroom accent, wallpaper was added to the bathroom and it’s gorgeous.
- Bunk/loft beds: Purchased the full-over-full loft beds the girls wanted—done and they love them.
- New bedding: Zippered bedding from Beddy’s, ideal for bunk beds—completed.
- Dresser: The tall dresser we had didn’t fit as planned, so the girls are sharing the existing dresser for now.
- Wall decor: Several pieces are hung, with a few final touches left before the full reveal.
- Hem curtains: Still on the to-do list.
- Ceiling fan and bathroom light replaced—both completed.
Grade for the room: A-. A lot was accomplished, but a few finishing touches remain and will be included in the July–September goals.

2. Finish the Office Space & Share It
- Once the bamboo blinds arrive and are installed, I’ll reveal the office. That’s the final piece to show the completed space.
3. Finish the Living Room & Share It
- Hide TV cords behind the wall — completed.
- Final art or decor for the last wall — instead of a painting we added a faux fiddle leaf fig and it works beautifully.
- Hang TV above the mantel — completed.
- Style the bookshelves and hang curtains — completed.
- Create a gallery wall — completed.

A+ for the living room—this ended up being our favorite room in the house.
BONUS: A new light fixture for the eat-in kitchen has been ordered and I’m excited to install and share it.
Home Goals for 2020 (July–September)
Here are the three goals I’ll focus on over the next quarter.
1. Finish the Girls’ Bedroom and Bathroom
- Complete decorating with items we already own.
- Paint the window seat Simply White.
- Hem the curtains.
- Decide on and paint the bathroom/shower room color.
- Replace the old toilet paper holder to match new towel hardware.
2. Add Personality to the Kitchen
The kitchen doesn’t need a full renovation but does need color and personality to better tie into the navy living room and bring in a coastal, seagrass-and-blue vibe.
- Create or order a custom window treatment for the sink window in a botanical fabric.
- Install the new light over the table.
- Replace or refinish the kitchen hardware (all 42 knobs!) with brass or spray-painted options.
- Add a pendant light over the island.
- Add more wall decor, a runner in front of the stove, and a rug under the table.
- Install bamboo blinds for the French doors and replace counter stools with something more fun.
- Possible extras: curtains, a tile backsplash (I’ve never tiled before), or painting the pantry door or island a bold color.
A kitchen mood board will be coming soon to capture the coastal inspiration I’ve been collecting for years.

3. Finally Share the Office Reveal
Once the bamboo blinds arrive and are installed, I’ll post the full office reveal. It’s the last detail holding that room back from being complete.
That’s my focused plan for the next two months: finish the rooms I’ve already started and give the kitchen a thoughtful refresh. Smaller, more intentional lists keep me from jumping from project to project and help ensure each space reaches a satisfying finish before I move on to the next big idea—like the master bedroom or garage overhaul.
More posts you will love:
- Our Current House
- Two Years: Before & After Home Tour
- Traditional Dining Room Reveal












